• Home
  • About Us
  • Our Services
    • STORE RESET SERVICES
    • New Store Setup Services
    • Signage and POP Installation
    • Retail Fixture Installation
    • Retail Rollouts in Canada
    • Visual Merchandising
  • Testimonials
  • Projects
  • Careers
  • Service Areas
    • Calgary
    • Charlottetown
    • Edmonton
    • Halifax
    • Montreal
    • Moncton
    • Ottawa
    • Toronto
    • Vancouver
    • Winnipeg
    • St. John’s, NL
  • Blog
  • Contact
  • Home
  • About Us
  • Our Services
    • STORE RESET SERVICES
    • New Store Setup Services
    • Signage and POP Installation
    • Retail Fixture Installation
    • Retail Rollouts in Canada
    • Visual Merchandising
  • Testimonials
  • Projects
  • Careers
  • Service Areas
    • Calgary
    • Charlottetown
    • Edmonton
    • Halifax
    • Montreal
    • Moncton
    • Ottawa
    • Toronto
    • Vancouver
    • Winnipeg
    • St. John’s, NL
  • Blog
  • Contact
Menu

Case Study

Home Depot Cantilever

« Previous
Next »

Client:

Home Depot Canada

Type of Project:

Store Fixture Installation

Project Duration:

3 months

GFA:

500-600 sq. ft. per location

Year Completed:

2025/2026

Scope:

Cantilever racking system upgrade

Home Depot Canada initiated a nationwide rollout of new cantilever racking systems to support its operational goals of modernizing the lumber and building materials department.

The objectives were clear:

    • Right-size inventory levels to match evolving sales patterns.
    • Improve inventory turns and reduce carrying costs.
    • Reduce cull lumber and product damage.
    • Increase assortment and expand available SKUs.
    • Drive overall sales growth through better merchandising and accessibility.

The challenge was to execute these large-scale installations across multiple active retail environments — each with unique layouts and regional safety standards — while keeping operations running smoothly and maintaining a consistent installation quality nationwide.

Planning & Coordination
The Reset Team developed a national rollout schedule, coordinating with Home Depot’s store operations, engineering, and safety teams to minimize disruption to customers and staff.

Installation / Build
Each store installation followed a standardized process:

    • Installation of 10 uprights per night.
    • Mounting of arms, cross braces, and horizontal brackets.
    • Installation of safety brackets and hardware.
    • Torque testing of all components to a minimum of 170 ft-lb.
    • End-of-phase inspection of at least 25% of the system before load approval.

Phasing / Timeline
Each location was completed in just four overnight shifts, allowing stores to remain operational during the day.

Quality Control / Testing
All completed locations passed inspection on the first visit, confirming accuracy, safety, and compliance with Home Depot’s engineering standards.

KEY HIGHLIGHTS:

    • National consistency: Executed unique installations across 17 sites with zero rework.
    • Four-night turnaround: Full installation and inspection in less than one week.
    • Precision control: Every component torqued to exact manufacturer specs.
    • Certified crews: Teams trained in both retail and industrial racking systems.
    • Flawless execution: 100% first-pass inspection approval across all sites.
    • Minimal disruption: Overnight execution ensured normal store hours and customer flow.

RESULTS & OUTCOMES:

The upgraded cantilever racking systems have allowed Home Depot to:

    • Increase vertical storage capacity and improve overall inventory organization.
    • Reduce product loss and damage associated with older systems.
    • Improve stocking efficiency and faster access for associates and customers.
    • Enhance customer experience through a cleaner, safer, and more efficient presentation of lumber and building materials.

These outcomes directly support Home Depot’s retail performance goals — improved inventory turns, increased sales, and reduced shrinkage.

CLIENT TESTIMONIAL:

I completed the inspection of the partially completed cantilever installation at HD 7119 Skyview this morning.  It was the best store I have reviewed thus far.  Excellent installation.  Great job.  Approved for loading when the Installers hand it over.

Jonathan Hirst P. Eng

Vice President & General Manager

North American Storage

TECHNICAL DETAILS / SPECS:

Tools & Equipment Used:

    • Corded / Cordless Hammer Drills
    • Heavy-Duty Impact Drills
    • 200 lb Torque Wrench
    • ¾” x 18″ 4-Cutter SDS-Plus MX4 Carbide Drill Bits
    • Scissor Lift & Forklift

Load Testing:

    • Torque verification at 170 ft-lb minimum
    • 25% installation inspection prior to load approval
Recent Posts
Read More

Why Proactive Pallet Racking Repair Protects Your Warehouse

Dec 16, 2025

In the fast-paced world of logistics and retail, your warehouse is the engine that keeps the business moving. However, the pressure to meet order deadlines...

Read More

The Checkout Experience: Why it Pays to Invest in Custom Retail Counters

Nov 25, 2025

The checkout counter is where every retail transaction culminates—yet it's one of the most overlooked areas in store design. While retailers invest heavily in eye-catching...

Read More

How to Execute a Flawless New Store Setup in Canada

Oct 22, 2025

Opening a new retail location in Canada is an exciting milestone—but it's also one of the most complex undertakings in the retail industry. Unlike renovating...

  • About
  • Services
  • Testimonials
  • Projects
  • Blog
  • Accessibility
  • Contact

P: 905-882-3140

F: 866-936-1974

Address: 28 Essex Ave, Thornhill, ON L3T 3Y7

Site Map

© 2026 The Reset Team. All rights reserved.