• Home
  • About Us
  • Our Services
  • Testimonials
  • Projects
  • Blog
  • Contact
Menu

Case Study

Bell Store

This project for Bell included demolition, new construction and complete build-out of a fantastic retail store located in a high-profile AAA shopping centre.

Next »

Client:

National Telecommunications Retailer

Type of Project:

Retail Store Build

Duration of Project:

3 months

GFA:

878 sq. ft.

Year Completed:

2019

Scope:

Full demolition of existing store, full build of new store

This new store build for Bell Canada is located in a prestigious downtown shopping centre in South Toronto. The project involved de-commissioning an existing retail space by taking it to the bare walls before re-building with the following elements:

  • New electrical and data
  • Trenching of floors
  • Window glazing
  • Fire suppression
  • Plumbing and HVAC
  • New flooring, walls and ceilings

The Reset Team also provided installation of the folding door systems and threshold flooring consistent with mall standards. Our fixture installation service were used to place all the millwork displays, store fixtures, light boxes and signage.

Get In Touch

The Reset Team is extremely proud of its longstanding relationships in the retail and commercial industries and is grateful for your continued support – thank you!

We would love to hear from you, so whether you are getting in touch, or just getting back in touch, we’ll be here.

Contact Us
  • About
  • Services
  • Testimonials
  • Projects
  • Blog
  • Contact

P: 905-882-3140

F: 866-936-1974

© 2023 The Reset Team. All rights reserved.

Website by GeekPower Web Design in Toronto